Back to Search
Start Over
大型过江隧道控制测量关键技术研究.
- Source :
- Railway Investigation & Surveying; 2022, Vol. 48 Issue 4, p1-4, 4p
- Publication Year :
- 2022
-
Abstract
- <i>Copyright of Railway Investigation & Surveying is the property of Railway Investigation & Surveying Editorial Office and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
- Subjects :
- TUNNEL design & construction
TUNNELS
CAVES
BORING & drilling (Earth & rocks)
Subjects
Details
- Language :
- Chinese
- ISSN :
- 16727479
- Volume :
- 48
- Issue :
- 4
- Database :
- Complementary Index
- Journal :
- Railway Investigation & Surveying
- Publication Type :
- Academic Journal
- Accession number :
- 158951604
- Full Text :
- https://doi.org/10.19630/j.cnki.tdkc.202204010001