Back to Search
Start Over
Pattern search method for accelerating Stope boundary optimization problem in underground mining operations.
- Source :
- Engineering Optimization; May2022, Vol. 54 Issue 5, p881-893, 13p
- Publication Year :
- 2022
-
Abstract
- The Stope Boundary Optimization (SBO) problem refers to the layout design of production areas (stopes) in an underground mining operation. It falls within the domain of strategic mine planning and a model that addresses this problem aims to maximize profitability, offers optimal management of mineral resources and facilitates decision making around capital investments. The SBO problem is computationally complex and a method that offers solution within a reasonable computation time does not exist. In this article, a combination of a new greedy algorithm and a pattern search technique with an integer programming model is proposed. An implementation of the proposed method on three realistic case studies confirms its efficiency in generating robust solutions with a better optimality gap and considerably less computational effort. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 0305215X
- Volume :
- 54
- Issue :
- 5
- Database :
- Complementary Index
- Journal :
- Engineering Optimization
- Publication Type :
- Academic Journal
- Accession number :
- 156867861
- Full Text :
- https://doi.org/10.1080/0305215X.2021.1932869