Back to Search Start Over

Improvement of a Furniture Production Line Based on Flexsim.

Authors :
Guo Jidong
Liang Yuyan
Zhang Kaibin
Jiang Junhao
Feng Caiping
Mo Yuwei
Zhang Yongyang
Zhou Dawei
Source :
Proceedings of the International Conference on Industrial Engineering & Operations Management; 7/9/2021, p133-143, 11p
Publication Year :
2021

Abstract

Aiming at the balance and bottleneck process of a furniture production line, this study simulates the production status by Flexsim modeling and simulation, improves the bottleneck process by using ECRS principle and program analysis, establishes 0-1 integer programming model for station reorganization, and obtains the optimized workshop processing flow by using LINGO software. The results show that the total time of the production line is reduced by 87 seconds, and the production balance rate is increased by 34.7%, which solves the practical problems in production and provides a reference scheme for production improvement. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
21698767
Database :
Complementary Index
Journal :
Proceedings of the International Conference on Industrial Engineering & Operations Management
Publication Type :
Conference
Accession number :
155415630