Back to Search
Start Over
Improvement of a Furniture Production Line Based on Flexsim.
- Source :
- Proceedings of the International Conference on Industrial Engineering & Operations Management; 7/9/2021, p133-143, 11p
- Publication Year :
- 2021
-
Abstract
- Aiming at the balance and bottleneck process of a furniture production line, this study simulates the production status by Flexsim modeling and simulation, improves the bottleneck process by using ECRS principle and program analysis, establishes 0-1 integer programming model for station reorganization, and obtains the optimized workshop processing flow by using LINGO software. The results show that the total time of the production line is reduced by 87 seconds, and the production balance rate is increased by 34.7%, which solves the practical problems in production and provides a reference scheme for production improvement. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 21698767
- Database :
- Complementary Index
- Journal :
- Proceedings of the International Conference on Industrial Engineering & Operations Management
- Publication Type :
- Conference
- Accession number :
- 155415630