BEHIND THE SCENES: Historic auditorium gets cooling system replacement.
- Source :
- PM Engineer; Aug2021, Vol. 27 Issue 8, p25-25, 1p
- Publication Year :
- 2021
-
Abstract
- The article informs that local contractor Hydro-Temp Mechanical (HTM) was tasked with renovating the Keller Auditorium's, in downtown Portland, Oregon, basement level mechanical room .It reports that HTM knew the room needed a complete re-imagination so they partnered with Victaulic, a producer of mechanical pipe joining solutions, to design and install a new piping system that wouldn't disrupt the day-to-day operations of the auditorium.