Back to Search
Start Over
大直径顶管施工管土相互作用实测分析——以佛山市电力隧道顶管工程为例.
- Source :
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban); Aug2021, Vol. 41 Issue 8, p1353-1360, 8p
- Publication Year :
- 2021
-
Abstract
- <i>Copyright of Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban) is the property of Tunnel Construction Editorial Office and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
- Subjects :
- GROUTING
ARCH model (Econometrics)
WATER pressure
SOILS
Subjects
Details
- Language :
- Chinese
- ISSN :
- 20964498
- Volume :
- 41
- Issue :
- 8
- Database :
- Complementary Index
- Journal :
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban)
- Publication Type :
- Academic Journal
- Accession number :
- 152719274
- Full Text :
- https://doi.org/10.3973/j.issn.2096-4498.2021.08.011