Back to Search Start Over

大直径顶管施工管土相互作用实测分析——以佛山市电力隧道顶管工程为例.

Authors :
牛国伦
马保松
张鹏
陈晓龙
王靖
Source :
Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban); Aug2021, Vol. 41 Issue 8, p1353-1360, 8p
Publication Year :
2021

Abstract

<i>Copyright of Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban) is the property of Tunnel Construction Editorial Office and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)

Details

Language :
Chinese
ISSN :
20964498
Volume :
41
Issue :
8
Database :
Complementary Index
Journal :
Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban)
Publication Type :
Academic Journal
Accession number :
152719274
Full Text :
https://doi.org/10.3973/j.issn.2096-4498.2021.08.011