Back to Search
Start Over
Co-simulation Hardware in the Loop Test bench for a Wind Turbine: Validation of a wind turbine black start capability.
- Source :
- Digital Proceedings of the Virtual '19th International Workshop on Large-Scale Integration of Wind Power into Power Systems as well as on Transmission Networks for Offshore Wind Power Plants'; 2019, p1-7, 7p
- Publication Year :
- 2019
-
Abstract
- With the rise of wind power generation in the power grid, plant operators and transmission system operators identify the need to procure different ancillary services from wind power plants. Self-energization of a wind turbine and black start capability of a wind power plant are functions that offer multiple benefits to reduce costs of development and operation of a wind power plant. This paper presents two test benches that make use of co-simulation and hardware in the loop methodologies to develop self-energization and black start capability of a 1 MVA Type 4 wind turbine. The obtained results for the validation of black start capability are presented in this paper. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISBNs :
- 9783982008080
- Database :
- Complementary Index
- Journal :
- Digital Proceedings of the Virtual '19th International Workshop on Large-Scale Integration of Wind Power into Power Systems as well as on Transmission Networks for Offshore Wind Power Plants'
- Publication Type :
- Conference
- Accession number :
- 152332751