Back to Search Start Over

Non-productive time optimization for 5-axis EDM drilling using HVNTS algorithm.

Authors :
Wang, Jian
Xi, Xue-Cheng
Qin, Ling
Zhang, Ya-Ou
Zhao, Wan-Sheng
Source :
International Journal of Production Research; Aug2021, Vol. 59 Issue 16, p5068-5082, 15p, 5 Diagrams, 5 Charts, 3 Graphs
Publication Year :
2021

Abstract

This paper presents a hybrid variable neighbourhood search/tabu search (HVNTS) method and a neighbourhood generation strategy called pairwise inter-reshuffle (PIR) for process planning of 5-axis electrical discharge machining (EDM) drilling processes, which aims to minimize the total non-productive time of the machining process, including tool travelling time, tool switching time and Z-axis compensation moving time. To obtain a mathematical model of the non-productive time, a kinematic transformation and a Chebyshev distance function are then utilized. To solve the mathematical model efficiently, an HVNTS algorithm is applied as the model has a large number of 0–1variables. To improve the solution quality, the PIR method and a dynamic neighbourhood strategy are applied simultaneously and verified. The obtained simulation results demonstrate that the proposed basic and the improved HVNTS have a significant contribution in optimizing the non-productive time of the 5-axis EDM drilling process effectively. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
00207543
Volume :
59
Issue :
16
Database :
Complementary Index
Journal :
International Journal of Production Research
Publication Type :
Academic Journal
Accession number :
151932909
Full Text :
https://doi.org/10.1080/00207543.2020.1779961