Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty.

Authors :
Hassan, Abbas
El-Rayes, Khaled
Attalla, Mohamed
Source :
Engineering Construction & Architectural Management (09699988); 2021, Vol. 28 Issue 6, p1615-1634, 20p
Publication Year :
2021

Abstract

Purpose: This paper presents the development of a novel model for optimizing the scheduling of crew deployments in repetitive construction projects while considering uncertainty in crew production rates. Design/methodology/approach: The model computations are performed in two modules: (1) simulation module that integrates Monte Carlo simulation and a resource-driven scheduling technique to calculate the earliest crew deployment dates for all activities that fully comply with crew work continuity while considering uncertainty; and (2) optimization module that utilizes genetic algorithms to search for and identify optimal crew deployment plans that provide optimal trade-offs between project duration and crew deployment plan cost. Findings: A real-life example of street renovation is analyzed to illustrate the use of the model and demonstrate its capabilities in optimizing the stochastic scheduling of crew deployments in repetitive construction projects. Originality/value: The original contribution of this research is creating a novel multiobjective stochastic scheduling optimization model for both serial and nonserial repetitive construction projects that is capable of identifying an optimal crew deployment plan that simultaneously minimizes project duration and crew deployment cost. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
09699988
Volume :
28
Issue :
6
Database :
Complementary Index
Journal :
Engineering Construction & Architectural Management (09699988)
Publication Type :
Academic Journal
Accession number :
151099704
Full Text :
https://doi.org/10.1108/ECAM-05-2020-0304