Back to Search Start Over

双线盾构扩建地铁车站的插管冻结法及施工力学特性研究.

Authors :
胡指南
孟祥飞
刘志春
林 攀
王煦霖
Source :
Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban); Apr2021, Vol. 41 Issue 4, p579-587, 9p
Publication Year :
2021

Abstract

<i>Copyright of Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban) is the property of Tunnel Construction Editorial Office and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)

Details

Language :
Chinese
ISSN :
20964498
Volume :
41
Issue :
4
Database :
Complementary Index
Journal :
Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban)
Publication Type :
Academic Journal
Accession number :
150322844
Full Text :
https://doi.org/10.3973/j.issn.2096-4498.2021.04.007