Cite
Electric short-term load forecast integrated method based on time-segment and improved MDSC-BP.
MLA
Wang, Rui, et al. “Electric Short-Term Load Forecast Integrated Method Based on Time-Segment and Improved MDSC-BP.” Systems Science & Control Engineering, vol. 9, no. 1, Apr. 2021, pp. 80–86. EBSCOhost, https://doi.org/10.1080/21642583.2020.1843088.
APA
Wang, R., Chen, S., & Lu, J. (2021). Electric short-term load forecast integrated method based on time-segment and improved MDSC-BP. Systems Science & Control Engineering, 9(1), 80–86. https://doi.org/10.1080/21642583.2020.1843088
Chicago
Wang, Rui, Shiwen Chen, and Jing Lu. 2021. “Electric Short-Term Load Forecast Integrated Method Based on Time-Segment and Improved MDSC-BP.” Systems Science & Control Engineering 9 (1): 80–86. doi:10.1080/21642583.2020.1843088.