Ground collapse caused by shield tunneling in sandy cobble stratum and its control measures.
- Source :
- Bulletin of Engineering Geology & the Environment; Dec2020, Vol. 79 Issue 10, p5599-5614, 16p
- Publication Year :
- 2020
-
Abstract
- This study investigated several ground collapses in sandy cobble strata induced by shield tunneling in two intervals of Lanzhou Metro Line 1 and proposed corresponding control measures. Ground collapses were classified into three types (A, B, and C). The distribution of low-compactness zones was the primary cause of the collapses that occurred after steady excavation (A-type), indicating that advanced grouting should be conducted beneath these zones. The grouting area should be a semi-circular ring in the transverse section, with a grouting ring height and thickness of 1.05 m and 0.51 m, respectively. A poor tunneling state caused by fluidity reduction in the cutter chamber was the main reason for collapses caused by restarting the shield after long-term shutdown (B-type). We suggest rotating the cutterhead every 12 h during long-term shutdown and supplementing the bentonite until the cutterhead torque falls below 3500 kN·m. Collapses caused by cutterhead blockage (C-type) were mainly due to encountering large boulders during tunneling. We suggest pulling the front shield back with hinge equipment when the cutterhead is blocked, with a backward distance greater than the penetration distance (35 mm) and a face pressure above the limit support pressure calculated using the method presented in this paper. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 14359529
- Volume :
- 79
- Issue :
- 10
- Database :
- Complementary Index
- Journal :
- Bulletin of Engineering Geology & the Environment
- Publication Type :
- Academic Journal
- Accession number :
- 146998558
- Full Text :
- https://doi.org/10.1007/s10064-020-01878-9