Cite
Construction of software using gain-schedule/auto-adaptive control strategy for automation in drilling fluid production plants.
MLA
Magalhães, S. C., et al. “Construction of Software Using Gain-Schedule/Auto-Adaptive Control Strategy for Automation in Drilling Fluid Production Plants.” Journal of Petroleum Exploration & Production Technology, vol. 10, no. 2, Feb. 2020, pp. 501–14. EBSCOhost, https://doi.org/10.1007/s13202-019-00746-x.
APA
Magalhães, S. C., Fontella, G., Borges, R. F. O., Vega, M. P., Calçada, L. A., & Scheid, C. M. (2020). Construction of software using gain-schedule/auto-adaptive control strategy for automation in drilling fluid production plants. Journal of Petroleum Exploration & Production Technology, 10(2), 501–514. https://doi.org/10.1007/s13202-019-00746-x
Chicago
Magalhães, S. C., G. Fontella, R. F. O. Borges, M. P. Vega, L. A. Calçada, and C. M. Scheid. 2020. “Construction of Software Using Gain-Schedule/Auto-Adaptive Control Strategy for Automation in Drilling Fluid Production Plants.” Journal of Petroleum Exploration & Production Technology 10 (2): 501–14. doi:10.1007/s13202-019-00746-x.