Cite
瓦斯抽采钻机连续装卸钻杆装置设计.
MLA
武斌波, et al. “瓦斯抽采钻机连续装卸钻杆装置设计. (Chinese).” Journal of Mine Automation, vol. 44, no. 2, Feb. 2018, pp. 63–67. EBSCOhost, https://doi.org/10.13272/j.issn.1671-251x.2017070019.
APA
武斌波, 郭文亮, 寇子明, 宫晓琴, & 辛宇鹏. (2018). 瓦斯抽采钻机连续装卸钻杆装置设计. (Chinese). Journal of Mine Automation, 44(2), 63–67. https://doi.org/10.13272/j.issn.1671-251x.2017070019
Chicago
武斌波, 郭文亮, 寇子明, 宫晓琴, and 辛宇鹏. 2018. “瓦斯抽采钻机连续装卸钻杆装置设计. (Chinese).” Journal of Mine Automation 44 (2): 63–67. doi:10.13272/j.issn.1671-251x.2017070019.