Back to Search Start Over

盾构直接切削桩基施工关键技术.

Authors :
杜闯东
张 杰
唐纵雄
Source :
Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban); Oct2019, Vol. 39 Issue 10, p1666-1677, 12p
Publication Year :
2019

Abstract

<i>Copyright of Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban) is the property of Tunnel Construction Editorial Office and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)

Details

Language :
Chinese
ISSN :
20964498
Volume :
39
Issue :
10
Database :
Complementary Index
Journal :
Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban)
Publication Type :
Academic Journal
Accession number :
141081112
Full Text :
https://doi.org/10.3973/j.issn.2096-4498.2019.10.014