Operation and Control of a Full‐Scale Biogas Plant Treating Wastewater from the Cleaning of Car Tanks.
- Source :
- Chemical Engineering & Technology; Jan2020, Vol. 43 Issue 1, p84-94, 11p
- Publication Year :
- 2020
-
Abstract
- A 1200‐m3 full‐scale biogas plant treating highly polluted wastewater (WW) from the cleaning of tank cars transporting food and fodder is working stably and efficiently despite the WW is constantly varying in strength and composition, is easily acidifying, and low in alkalinity. Na2CO3 has to be added to maintain the digester alkalinity and the digester pH at defined values due to softened water used for car tank cleaning. Monitoring volatile organic acid concentration and controlling the alkalinity in the digester are essential for maintaining the digestion process stability. Biogas production is adapted to the demand by a modulated feeding regime. The drastic modulation of feeding is possible due to the moderate organic loading of the plant along with the high average hydraulic retention time. [ABSTRACT FROM AUTHOR]
- Subjects :
- BIOGAS
BIOGAS production
SEWAGE
TANKS
RF values (Chromatography)
Subjects
Details
- Language :
- English
- ISSN :
- 09307516
- Volume :
- 43
- Issue :
- 1
- Database :
- Complementary Index
- Journal :
- Chemical Engineering & Technology
- Publication Type :
- Academic Journal
- Accession number :
- 141077478
- Full Text :
- https://doi.org/10.1002/ceat.201900398