Cite
Optimal Timing for Lane(s) Addition to an Existing Highway: A Benefit–Cost Approach.
MLA
Khan, Muhammad Asif, et al. “Optimal Timing for Lane(s) Addition to an Existing Highway: A Benefit–Cost Approach.” Arabian Journal for Science & Engineering (Springer Science & Business Media B.V. ), vol. 44, no. 5, May 2019, pp. 4169–82. EBSCOhost, https://doi.org/10.1007/s13369-018-3350-8.
APA
Khan, M. A., Ahmed, A., & Kayani, W. I. U. H. (2019). Optimal Timing for Lane(s) Addition to an Existing Highway: A Benefit–Cost Approach. Arabian Journal for Science & Engineering (Springer Science & Business Media B.V. ), 44(5), 4169–4182. https://doi.org/10.1007/s13369-018-3350-8
Chicago
Khan, Muhammad Asif, Anwaar Ahmed, and Wasim Irshad Ul Haq Kayani. 2019. “Optimal Timing for Lane(s) Addition to an Existing Highway: A Benefit–Cost Approach.” Arabian Journal for Science & Engineering (Springer Science & Business Media B.V. ) 44 (5): 4169–82. doi:10.1007/s13369-018-3350-8.