Back to Search Start Over

Dynamic response to demand variability for precast production rescheduling with multiple lines.

Authors :
Wang, Zhaojing
Hu, Hao
Source :
International Journal of Production Research; Aug2018, Vol. 56 Issue 16, p5386-5401, 16p, 1 Color Photograph, 3 Diagrams, 4 Charts, 2 Graphs
Publication Year :
2018

Abstract

Production scheduling plays a crucial role in the prefabricated construction productivity and on-time delivery of precast components (PCs). However, previous studies mainly focused on the static scheduling of single production line without considering the demand variability in practice. To achieve dynamic production planning, a Two-level Rescheduling Model for Precast Production with multiple production lines is developed to minimise the rescheduling costs based on genetic algorithm, from the two levels of (1) selection of production line and (2) rescheduling of jobs based on PCs’ priority. Further, two scenarios of different and shared mould types are investigated to represent real-world production environments. Finally, a real case study is conducted to test the validity of proposed rescheduling model. 58.1 and 48.5% cost savings are achieved by comparison to no response to changes and heuristic rescheduling methods, respectively. This research contributes to the precast production theory by expanding the insight into dynamic rescheduling with multiple production lines. The methodology will promote the on-time delivery of PCs and enhance the dynamic precast production management. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
00207543
Volume :
56
Issue :
16
Database :
Complementary Index
Journal :
International Journal of Production Research
Publication Type :
Academic Journal
Accession number :
131778677
Full Text :