Back to Search
Start Over
READY FOR THE SUMMER.
- Source :
- Contractor; Jun2017, p24-28, 5p, 4 Color Photographs
- Publication Year :
- 2017
-
Abstract
- The article talks about the new $22 million bridge on SH6 across theKawarau River. The design-and-construct contract was awarded to McConnell Dowell in September 2015, for a bridge which would be 250 metres long and 14 metres wide and built on a curve with a 163 meter radius, and sitting on five single column piers spaced 45 metres apart.
Details
- Language :
- English
- ISSN :
- 01101382
- Database :
- Complementary Index
- Journal :
- Contractor
- Publication Type :
- Periodical
- Accession number :
- 124525206