Back to Search Start Over

Integrated short-term scheduling and production planning in an ethylene plant based on Lagrangian decomposition.

Authors :
Wang, Zihao
Li, Zukui
Feng, Yiping
Rong, Gang
Source :
Canadian Journal of Chemical Engineering; Sep2016, Vol. 94 Issue 9, p1723-1739, 17p
Publication Year :
2016

Abstract

A cracking furnace, which is the major unit involved in ethylene production, produces various petrochemical products ranging from ethylene to pitch and determines the production yield of an ethylene plant. It is essential to consider the operational performances of the cracking furnaces and to incorporate them into the whole plant's planning problem. Facing this challenge, this paper developed an optimization model, which integrates the scheduling problem of upstream cracking furnaces and the operational planning of the downstream units under a synchronized global time scale. Moreover, a modified Lagrangian decomposition algorithm is proposed for solving the large-scale mixed integer nonlinear optimization problem. An industrial case study demonstrates the feasibility of the integrated model and the effectiveness of the solution algorithm. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
00084034
Volume :
94
Issue :
9
Database :
Complementary Index
Journal :
Canadian Journal of Chemical Engineering
Publication Type :
Academic Journal
Accession number :
117264950
Full Text :
https://doi.org/10.1002/cjce.22544