Back to Search Start Over

Systematic Layout Planning and Balancing of Engine Production Processes for After Test and After Paint Assembly Lines.

Authors :
Prasad, R. Durga
Kumar, K. Vishwa
Jeeva, P. A.
Source :
International Journal of Vehicle Structures & Systems (IJVSS); 2016, Vol. 8 Issue 1, p41-44, 4p, 1 Color Photograph, 5 Diagrams, 5 Charts
Publication Year :
2016

Abstract

This paper is aimed at reducing the costs, maintaining the quality and designing the plant layout that is flexible to meet the customer demand. A number of stations in the after test assembly and after paint assembly are selected for capturing the production process requirements. Then, failure mode and effects analysis of after test assembly is carried out. Layout designs for the after test assembly and after paint assembly are developed using systematic layout planning and are validated using Spaghetti diagrams. With the improved layout, considerable reduction in the distance moved by the operator has resulted in 20% cost saving at 80% Takt time. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
09753060
Volume :
8
Issue :
1
Database :
Complementary Index
Journal :
International Journal of Vehicle Structures & Systems (IJVSS)
Publication Type :
Academic Journal
Accession number :
114967864
Full Text :
https://doi.org/10.4273/ijvss.8.1.08