Back to Search
Start Over
Minimising makespan in the two-stage assembly hybrid flow shop scheduling problem using artificial immune systems.
- Source :
- International Journal of Production Research; Feb2016, Vol. 54 Issue 4, p963-983, 21p
- Publication Year :
- 2016
-
Abstract
- Two-stage hybrid flow shop (HFS) scheduling problem followed by single assembly machine is addressed in this paper. To produce the final product, parts need to be processed on the HFS stages and thereafter, several parts are joined under the assembly operations based on the predefined Bill of Materials of the product. The aim of this research is to find the schedule which minimises completion time of the last product, i.e. makespan. For the considered problem, lower bound, heuristic algorithms and two metaheuristic techniques based on artificial immune system are developed. Computational results demonstrate that the proposed lower bound and heuristic algorithms outperform the existent lower bounds and heuristic algorithms. [ABSTRACT FROM PUBLISHER]
Details
- Language :
- English
- ISSN :
- 00207543
- Volume :
- 54
- Issue :
- 4
- Database :
- Complementary Index
- Journal :
- International Journal of Production Research
- Publication Type :
- Academic Journal
- Accession number :
- 113393793
- Full Text :
- https://doi.org/10.1080/00207543.2015.1035815