Back to Search Start Over

Long term remediation of highly polluted acid mine drainage: a sustainable approach to restore the environmental quality of the Odiel river basin.

Authors :
Caraballo MA
Macías F
Rötting TS
Nieto JM
Ayora C
Source :
Environmental pollution (Barking, Essex : 1987) [Environ Pollut] 2011 Dec; Vol. 159 (12), pp. 3613-9. Date of Electronic Publication: 2011 Sep 08.
Publication Year :
2011

Abstract

During 20 months of proper operation the full scale passive treatment in Mina Esperanza (SW Spain) produced around 100 mg/L of ferric iron in the aeration cascades, removing an average net acidity up to 1500 mg/L as CaCO(3) and not having any significant clogging problem. Complete Al, As, Cd, Cr, Cu, Ti and V removal from the water was accomplished through almost the entire operation time while Fe removal ranged between 170 and 620 mg/L. The system operated at a mean inflow rate of 43 m(3)/day achieving an acid load reduction of 597 g·(m(2) day)(-1), more than 10 times higher than the generally accepted 40 g·(m(2) day)(-1) value commonly used as a passive treatment system designing criteria. The high performance achieved by the passive treatment system at Mina Esperanza demonstrates that this innovative treatment design is a simple, efficient and long lasting remediation option to treat highly polluted acid mine drainage.<br /> (Copyright © 2011 Elsevier Ltd. All rights reserved.)

Details

Language :
English
ISSN :
1873-6424
Volume :
159
Issue :
12
Database :
MEDLINE
Journal :
Environmental pollution (Barking, Essex : 1987)
Publication Type :
Academic Journal
Accession number :
21862191
Full Text :
https://doi.org/10.1016/j.envpol.2011.08.003