Back to Search Start Over

Minimize FCCU startup problems.

Authors :
Ezernack, GDS Engineers, Inc., Houston, Texas, D. D.
Source :
Hydrocarbon Processing. Jun97, Vol. 76 Issue 6, p67. 4p. 7 Charts.
Publication Year :
1997

Abstract

Focuses on process engineers and fluid catalytic cracking unit (FCCU) operators that should carefully check out installations and any equipment modifications. Improper installation and equipment check; Information on impingement; Excessive velocities; Thermal expansion; Thermowells and pressure taps; Debris removal; Information on valve operation, refractory and accessibility; Improper unit operation.

Details

Language :
English
ISSN :
00188190
Volume :
76
Issue :
6
Database :
Academic Search Index
Journal :
Hydrocarbon Processing
Publication Type :
Periodical
Accession number :
9709240486