Back to Search
Start Over
Research on the Ecological Scheduling Decisions of the Jinping Cascade Hydropower Station on the Yalong River.
- Source :
-
Energy Sources Part A: Recovery, Utilization & Environmental Effects . May2014, Vol. 36 Issue 10, p1115-1122. 8p. - Publication Year :
- 2014
-
Abstract
- The Jinping cascade project on the Yalong River consists of the Jinping I and the Jinping II hydropower stations, in which the Jinping II hydropower station is a diversion-type hydropower station. There is a 119-km-long water-reduced reach between the lock site and a factory site. For the sustainable development of the watershed ecosystem health, a prescribed amount of water to support the ecosystem, called the process volume of ecological water requirements, should be discharged periodically to reduce the eco-environmental stress on the river channels. This article presents calculations of eco-scheduling of the Jinping cascade project under the given constraints of quantitatively analyzing and calculating the eco-flow process in a water-reduced reach. Comparative analysis has been carried out to search for the best scheduling scheme by using utility function theory. [ABSTRACT FROM PUBLISHER]
Details
- Language :
- English
- ISSN :
- 15567036
- Volume :
- 36
- Issue :
- 10
- Database :
- Academic Search Index
- Journal :
- Energy Sources Part A: Recovery, Utilization & Environmental Effects
- Publication Type :
- Academic Journal
- Accession number :
- 95113563
- Full Text :
- https://doi.org/10.1080/15567036.2010.544010