Preparing For And Completing A Construction Site Field Visit.
- Source :
-
Engineered Systems . Jan2014, Vol. 31 Issue 1, p92-92. 1p. - Publication Year :
- 2014
-
Abstract
- The article offers the author's insights on how design engineers can prepare and complete a construction site fiel visit. The author says that specific documents should be prepared before the schedule visit such as approved air handling unit (AHU) shop drawing, contract drawings with sheet metal and piping drawings, and contract drawing part plan and sections. It adds that field visit report, installation checklist, and corrective action log should be completed after the visit.