Back to Search
Start Over
Establishment of Production Process of JK2LB Jacket Section for ITER CS.
- Source :
-
IEEE Transactions on Applied Superconductivity . Jun2014, Vol. 24 Issue 3, p4800604-4800604. 4p. - Publication Year :
- 2014
-
Abstract
- The Japan Atomic Energy Agency is responsible for the procurement of the central solenoid (CS) conductor for ITER. The CS conductor uses a circular-in-square type sheath tube (jacket, outer dimension: 49 mm \times 49 mm square, inner diameter: 32.6 mm) made of high manganese stainless steel JK2LB. The CS jacket suffers high electromagnetic force with 60,000 cycles during its lifetime. Prior to mass-production of CS jacket sections for the ITER machine, production of 170 units of jacket sections has been carried out. During production, it was confirmed that dimensional and mechanical performances satisfy the ITER requirements. The nondestructive examination procedure for the CS jacket sections has been developed. As a result, mass-production processes of CS jacket have been established. [ABSTRACT FROM PUBLISHER]
- Subjects :
- *SOLENOIDS
*ELECTROMAGNETIC forces
*NUCLEAR energy
Subjects
Details
- Language :
- English
- ISSN :
- 10518223
- Volume :
- 24
- Issue :
- 3
- Database :
- Academic Search Index
- Journal :
- IEEE Transactions on Applied Superconductivity
- Publication Type :
- Academic Journal
- Accession number :
- 92774015
- Full Text :
- https://doi.org/10.1109/TASC.2013.2281536