Back to Search Start Over

A fuzzy time-dependent project scheduling problem.

Authors :
Huang, Wei
Oh, Sung-Kwun
Pedrycz, Witold
Source :
Information Sciences. Oct2013, Vol. 246, p100-114. 15p.
Publication Year :
2013

Abstract

Highlights: [•] A Fuzzy Time-dependent Project Scheduling Problem (FTPSP) is introduced and formulated. [•] The formula used to estimate the completion time in this problem is developed. [•] A collection of FTPSP models are proposed. [•] The proposed FTPSP models are handled through fuzzy simulation and genetic optimization. [Copyright &y& Elsevier]

Details

Language :
English
ISSN :
00200255
Volume :
246
Database :
Academic Search Index
Journal :
Information Sciences
Publication Type :
Periodical
Accession number :
89310934
Full Text :
https://doi.org/10.1016/j.ins.2013.05.026