Back to Search Start Over

The Auckland rail electrification project, New Zealand: accelerated bridge construction in seismic zones.

Authors :
Walker, Andrew
Wiles, Peter
Idle, David
Source :
Proceedings of the Institution of Civil Engineers. Civil Engineering. May2013, Vol. 166 Issue 5, p50-56. 7p.
Publication Year :
2013

Abstract

Accelerated bridge construction and precast bridge elements and systems were used to replace five bridges as part of the Auckland rail electrification project in New Zealand. This paper describes the replacement of five road-over-rail bridges, covering the fast-tracked design process, the collaborative approach required by all parties and the construction of bridges in periods of 5 weeks. The paper also describes the innovative solutions used to connect the precast elements, the relative success of each solution and the impact on the construction programme. A comparison of the cost of construction of these bridges against the more conventional construction techniques is also provided, with discussion on the economic benefit of accelerated construction. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
0965089X
Volume :
166
Issue :
5
Database :
Academic Search Index
Journal :
Proceedings of the Institution of Civil Engineers. Civil Engineering
Publication Type :
Conference
Accession number :
87027863
Full Text :
https://doi.org/10.1680/cien.12.00031