Back to Search
Start Over
Double Time In Chicago Goes Here.
- Source :
-
ENR: Engineering News-Record . 4/8/2013, Vol. 270 Issue 10, p10-10. 1p. - Publication Year :
- 2013
-
Abstract
- The article discusses a construction project by the Chicago Dept. of Transportation (CDOT) in Illinois to replace a portion of the Wells Street Bridge double-deck bascule drawbridge over the Chicago River in April 2013. Topics include the nine-day deadline for construction, prefabricatiopn of the steel trusses, and the use of barges during preparation and construction.
Details
- Language :
- English
- ISSN :
- 08919526
- Volume :
- 270
- Issue :
- 10
- Database :
- Academic Search Index
- Journal :
- ENR: Engineering News-Record
- Publication Type :
- Periodical
- Accession number :
- 87004214