Cite
Effectiveness Study of Methods for Removing Temporary Pavement Markings in Roadway Construction Zones.
MLA
Cho, Yong, et al. “Effectiveness Study of Methods for Removing Temporary Pavement Markings in Roadway Construction Zones.” Journal of Construction Engineering & Management, vol. 139, no. 3, Mar. 2013, pp. 257–66. EBSCOhost, https://doi.org/10.1061/(ASCE)CO.1943-7862.0000608.
APA
Cho, Y., Kabassi, K., Pyeon, J.-H., Choi, K., Wang, C., & Norton, T. (2013). Effectiveness Study of Methods for Removing Temporary Pavement Markings in Roadway Construction Zones. Journal of Construction Engineering & Management, 139(3), 257–266. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000608
Chicago
Cho, Yong, Koudous Kabassi, Jae-Ho Pyeon, Kunhee Choi, Chao Wang, and Terri Norton. 2013. “Effectiveness Study of Methods for Removing Temporary Pavement Markings in Roadway Construction Zones.” Journal of Construction Engineering & Management 139 (3): 257–66. doi:10.1061/(ASCE)CO.1943-7862.0000608.