Back to Search Start Over

Seasonally loaded waste stabilisation ponds: a novel application for intermittent discharge.

Authors :
Whalley, C. P.
Heaven, S.
Banks, C. J.
Salter, A. M.
Source :
Water Science & Technology. 2012, Vol. 66 Issue 9, p1893-1899. 7p.
Publication Year :
2012

Abstract

This research examined the use of a single facultative pond for treatment of an intermittent discharge from a UK campsite. The system was monitored over an 11-month period to determine the optimum time for discharge in terms of quality standards. The results showed that based on organic strength, discharge was possible in winter between November and March but February was the optimum to meet nutrient and suspended solids requirements. The pond showed rapid acclimatisation to the influent wastewater, with biochemical oxygen demand removal rates during the filling period of around 60 kg ha-1 day-1 and removal efficiencies of ∼95% after maturation. The system proved simple to operate. A major design factor is the requirement for storage of net incoming precipitation, which may provide dilution of residual pollutants but requires additional system capacity. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
02731223
Volume :
66
Issue :
9
Database :
Academic Search Index
Journal :
Water Science & Technology
Publication Type :
Academic Journal
Accession number :
83066305
Full Text :
https://doi.org/10.2166/wst.2012.397