Back to Search Start Over

Development of ITER Sector Subassembly Procedure, Tools, and Mock-up Test.

Authors :
Nam, Kyoungo
Park, Hyunki
Kim, Dongjin
Ahn, Heejae
Bak, Jooshik
Kim, Kyoungkyu
Kim, Byungseok
Im, Kihak
Shaw, Robert
Source :
IEEE Transactions on Plasma Science. 5/15/2012 Part 2 Part 2, Vol. 40 Issue 5, p1477-1483. 7p.
Publication Year :
2012

Abstract

The subassembly procedure and relevant tools for the complete 40^\circ sector assembly as a foundation of the ITER machine have been developed to meet technical and functional requirements for years. Based on the concept of subassembly procedure and tools provided by ITER Organization, detailed procedure and relevant purpose-built assembly tools are developed by Korea Domestic Agency. The tools described in this paper contain an upending tool, a lifting tool, a sector subassembly tool, and a radial beam and vacuum vessel supports with alignment units. To verify the 6-degree-of-freedom system for fine alignment of components in the sector subassembly tool, scale-down mock-up has been manufactured and tested. This paper presents the overall 40^\circ sector subassembly procedure, the fundamental specifications of the relevant assembly tools, and the current status of the mock-up developments. [ABSTRACT FROM PUBLISHER]

Details

Language :
English
ISSN :
00933813
Volume :
40
Issue :
5
Database :
Academic Search Index
Journal :
IEEE Transactions on Plasma Science
Publication Type :
Academic Journal
Accession number :
75125924
Full Text :
https://doi.org/10.1109/TPS.2012.2189024