Flood management selections for the Yangtze River midstream after the Three Gorges Project operation

Authors :
Fang, Hongwei
Han, Dong
He, Guojian
Chen, Minghong
Source :
Journal of Hydrology. Apr2012, Vol. 432-433, p1-11. 11p.
Publication Year :
2012

Abstract

Summary: After the Yangtze River was closed by the Three Gorges Project (TGP) in 2003, erosion occurred from the dam site to the river mouth, especially in the middle and lower reaches of the Yangtze River. However, in some local areas of Chenglingji reach which holds the key position for flood management, there is actually deposition in contrast to the expected erosion. In this paper, a one dimensional mathematical model of the river network with sediment transport is used as the tool to simulate flow and fluvial processes. The calculation domain is from Yichang, which is downstream of the dam, to Hankou, the controlling node of flood management, 694km long in total. The model is calibrated based on the field data of hydrology and sediment transport during the period from October 2003 to October 2008. Then the model is utilized to simulate the erosion and deposition of the middle and lower reaches of the Yangtze River in the next two decades, and produce the results of a new river channel after river bed deformation occurs. The typical flood processes of 1954 and 1998 in the Yangtze River basin are used to check the flood management scheme for the research area, and results show that water storage of Three Gorges Reservoir (TGR) and a flood diversion program downstream of the Yangtze River should be taken into consideration. [Copyright &y& Elsevier]

Details

Language :
English
ISSN :
00221694
Volume :
432-433
Database :
Academic Search Index
Journal :
Journal of Hydrology
Publication Type :
Academic Journal
Accession number :
73777299
Full Text :
https://doi.org/10.1016/j.jhydrol.2012.01.042