- Source :
-
Fusion Engineering & Design . Dec2010, Vol. 85 Issue 10-12, p1981-1985. 5p. - Publication Year :
- 2010
-
Abstract
- Abstract: The International Thermanuclear Experimental Reactor (ITER) tokamak device is composed of 9 vacuum vessel (VV)/toroidal field coils (TFCs)/vacuum vessel thermal shields (VVTS) 40° sectors. Each VV/TFCs/VVTS 40° sector is made up of one 40° VV, two 20° TFCs and associated VVTS segments. The 40° sectors are sub-assembled at assembly hall respectively and then nine 40° sectors sub-assembled at assembly hall are finally assembled at tokamak in-pit hall. The assembly strategy and tools for the 40° sector sub-assembly and final assembly should be developed to satisfy the basic assembly requirements of the ITER tokamak device. Accordingly, the purpose-built assembly tools should be designed and manufactured considering assembly plan, available space, cost, safety, easy operation, efficient maintenance, and so on. The 40° sector assembly tools are classified into 2 groups. One group is the sub-assembly tools including upending tool, lifting tool, sub-assembly tool, VV supports and bracing tools used at assembly hall and the other group is the in-pit assembly tools including lifting tool, central column, radial beams and their supports. This paper describes the current status of the assembly strategy and major tools for the VV/TFCs/VVTS 40° sector assembly at in-pit hall and assembly hall. The conceptual design of the major assembly tools and assembly process at assembly hall and tokamak in-pit hall are presented also. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 09203796
- Volume :
- 85
- Issue :
- 10-12
- Database :
- Academic Search Index
- Journal :
- Fusion Engineering & Design
- Publication Type :
- Academic Journal
- Accession number :
- 55518968
- Full Text :
- https://doi.org/10.1016/j.fusengdes.2010.07.009