Cite
Structuring ship design project approval mechanism towards installation of operator–system interfaces via fuzzy axiomatic design principles
MLA
Cebi, Selcuk, et al. “Structuring Ship Design Project Approval Mechanism towards Installation of Operator–system Interfaces via Fuzzy Axiomatic Design Principles.” Information Sciences, vol. 180, no. 6, Mar. 2010, pp. 886–95. EBSCOhost, https://doi.org/10.1016/j.ins.2009.10.018.
APA
Cebi, S., Celik, M., & Kahraman, C. (2010). Structuring ship design project approval mechanism towards installation of operator–system interfaces via fuzzy axiomatic design principles. Information Sciences, 180(6), 886–895. https://doi.org/10.1016/j.ins.2009.10.018
Chicago
Cebi, Selcuk, Metin Celik, and Cengiz Kahraman. 2010. “Structuring Ship Design Project Approval Mechanism towards Installation of Operator–system Interfaces via Fuzzy Axiomatic Design Principles.” Information Sciences 180 (6): 886–95. doi:10.1016/j.ins.2009.10.018.