Back to Search
Start Over
Bicriteria parallel flow line scheduling using hybrid population-based heuristics.
- Source :
-
International Journal of Advanced Manufacturing Technology . Nov2009, Vol. 43 Issue 7/8, p799-804. 6p. 2 Charts, 1 Graph. - Publication Year :
- 2009
-
Abstract
- The objective of this paper is to determine a schedule for parallel flow line with bicriteria objective of minimizing the total tardiness and earliness of jobs. An enhancement to its basic greedy randomized adaptive search procedure (GRASP) is used in conjunction with genetic algorithm (GA) and particle swarm optimization (PSO). The feasible solution of GRASP construction phase is used as initial population for both GA and PSO. A number of problems are solved, by varying the number of jobs, lines, and machines, using the hybrid PSO, hybrid GA, PSO, and GA-based methods and the results are compared. [ABSTRACT FROM AUTHOR]
- Subjects :
- *HEURISTIC
*GENETIC algorithms
*COMBINATORIAL optimization
*ALGORITHMS
*TARDINESS
Subjects
Details
- Language :
- English
- ISSN :
- 02683768
- Volume :
- 43
- Issue :
- 7/8
- Database :
- Academic Search Index
- Journal :
- International Journal of Advanced Manufacturing Technology
- Publication Type :
- Academic Journal
- Accession number :
- 43265158
- Full Text :
- https://doi.org/10.1007/s00170-008-1754-4