Testing and Demonstration Results of the 350 m Long HTS Cable System Installed in Albany, NY.

Authors :
Weber, C. S.
Lee, R.
Ringo, S.
Masuda, T.
Yumura, H.
Moscovic, J.
Source :
IEEE Transactions on Applied Superconductivity. Jun2007 Part 2 of 3, Vol. 17 Issue 2, p2038-2042. 5p. 3 Black and White Photographs, 2 Charts, 4 Graphs.
Publication Year :
2007

Abstract

The Albany Cable Project team (BOC, National Grid, Sumitomo Electric, SuperPower) have built and tested a 350-m long HTS cable and cryogenic system rated at 48 MVA (800 Arms, 34.5-kV). The cable system included the world's first demonstration of an HTS cable-to-cable joint (or splice) as well as some novel design aspects in both the cryogenic refrigeration system and the terminations. The cable was installed and began operation in July 2006. This paper will summarize the testing and operational aspects of the HTS cable system and its integration into the existing National Grid 34.5-kV network. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
10518223
Volume :
17
Issue :
2
Database :
Academic Search Index
Journal :
IEEE Transactions on Applied Superconductivity
Publication Type :
Academic Journal
Accession number :
26343573
Full Text :
https://doi.org/10.1109/TASC.2007.899828