Back to Search
Start Over
Magnet design and construction preparation for CYCIAE-100 at CIAE
- Source :
-
Nuclear Instruments & Methods in Physics Research Section B . Aug2007, Vol. 261 Issue 1/2, p25-30. 6p. - Publication Year :
- 2007
-
Abstract
- Abstract: A 100MeV H-compact cyclotron is being designed in China Institute of Atomic Energy (CIAE). It will provide a 75–100MeV, 200–500μA proton beam for various applications, including serving as a driving accelerator for RIB generation. In this paper, the basic magnet structure, 3D numerical simulation, magnetic material, mechanical design, deformation, imperfection field. will be described in detail respectively. In addition the preparation for construction will be discussed. [Copyright &y& Elsevier]
- Subjects :
- *ION sources
*NEUTRON sources
*RADIATION sources
*QUANTUM theory
Subjects
Details
- Language :
- English
- ISSN :
- 0168583X
- Volume :
- 261
- Issue :
- 1/2
- Database :
- Academic Search Index
- Journal :
- Nuclear Instruments & Methods in Physics Research Section B
- Publication Type :
- Academic Journal
- Accession number :
- 25769013
- Full Text :
- https://doi.org/10.1016/j.nimb.2007.04.229