Back to Search Start Over

Back to Basics.

Authors :
Mckew, Howard J.
Source :
Engineered Systems. Oct2006, Vol. 23 Issue 10, p8-9. 2p.
Publication Year :
2006

Abstract

The article offers tips for heat and ventilation engineers on how to replace a 20,000-cubic feet meters supply air system serving an office building. Engineers must have a Test and Balance firm document heating and ventilation existing conditions of the building. They must optimize the central air system's energy consumption as it pertains to the type of supply air system.

Details

Language :
English
ISSN :
08919976
Volume :
23
Issue :
10
Database :
Academic Search Index
Journal :
Engineered Systems
Publication Type :
Periodical
Accession number :
22850912