Back to Search Start Over

Future train traffic control: control by re-planning.

Authors :
Kauppi, Arvid
Wikström, Johan
Sandblad, Bengt
Andersson, Arne W.
Source :
Cognition, Technology & Work. Mar2006, Vol. 8 Issue 1, p50-56. 7p. 2 Diagrams, 1 Chart, 3 Graphs.
Publication Year :
2006

Abstract

Improving train traffic control can be a cost-efficient way to improve train traffic punctuality and increase utilization of existing and future railway infrastructure. However, performance in train traffic control tasks currently involves working on a technical level in order to regulate the traffic flow. Working in a preventive manner is poorly supported and train traffic controllers are usually restricted to just solving problems as they occur. This often results in unnecessarily long delays and decreased timeliness of train traffic. The main objective of this paper is to describe a proposed control strategy and a case study, which evaluates the control strategy and the prototype tool derived from the research. By shifting the control paradigm to a high-level control strategy, many of today’s problems may be avoided, with benefits of the reduction in delays, improved timeliness and better utilization of the infrastructure. Twenty-one train traffic controllers participated in a case study, with a simulated prototype environment. The majority of the participating train traffic controllers were positive to the new concepts and ideas. Many of the important aspects of the proposed control strategy can be investigated with the simulation, but due to the complexity of train traffic some issues must be evaluated in an operative environment. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
14355558
Volume :
8
Issue :
1
Database :
Academic Search Index
Journal :
Cognition, Technology & Work
Publication Type :
Academic Journal
Accession number :
19419707
Full Text :
https://doi.org/10.1007/s10111-005-0019-3