Channel Tunnel Rail Link section 1: ground engineering.

Authors :
O'riordan, Nick
Source :
Proceedings of the Institution of Civil Engineers. Civil Engineering. 2003, Vol. 156 Issue 6, p28-31. 4p.
Publication Year :
2003

Abstract

Some of the most innovative engineering design on the first section of the £52 billion Channel Tunnel Rail Link related to groundworks-ranging from dynamic analysis of trackbeds and pile slabs to dry soil mixing techniques and 3D groundwater modelling. This paper provides a brief overview of the geotechnical engineering work on section I and explains how the need to reduce design risk to a minimum resulted in valuable new industry guidance. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
0965089X
Volume :
156
Issue :
6
Database :
Academic Search Index
Journal :
Proceedings of the Institution of Civil Engineers. Civil Engineering
Publication Type :
Conference
Accession number :
18131471
Full Text :
https://doi.org/10.1680/cien.2003.156.6.28