Back to Search
Start Over
Design considerations for ash pond dyke construction in the Hilly terrain for high concentrated slurry disposal: a case study.
- Source :
-
International Journal of Mining & Geo-Engineering . Sep2024, Vol. 58 Issue 3, p251-255. 5p. - Publication Year :
- 2024
-
Abstract
- Designing an ash pond for the High Concentrated Slurry Disposal (HCSD) in hilly terrains poses a unique set of challenges. In such regions, the availability of barren land adjacent to the project sites is limited, making it difficult to locate suitable sites for ash pond construction. Furthermore, the hilly terrain and complex topography demand careful planning and design to ensure the long-term stability and safety of the ash pond and associated infrastructure. This paper discusses the design considerations for the construction of ash pond dykes in a hilly region of Vietnam for the HCSD disposal. The case study highlights detailed geotechnical design investigations, such as soil type, slope stability and groundwater conditions. In addition, geotechnical instrumentation to monitor the performance of ash pond dykes and the subsoil supporting it during and after construction is also discussed. The paper also examines the environmental and hydrological design aspects of the ash pond, including the development of drainage and channelization concept along the hilly terrain to manage storm water and prevent the mixing of rain water with ash slurry. Such mixing could otherwise create an environmental hazard. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 23456930
- Volume :
- 58
- Issue :
- 3
- Database :
- Academic Search Index
- Journal :
- International Journal of Mining & Geo-Engineering
- Publication Type :
- Academic Journal
- Accession number :
- 180664564
- Full Text :
- https://doi.org/10.22059/IJMGE.2024.357525.595052