Back to Search
Start Over
J-PARC linac and RCS – operational status and upgrade plan to 2 MW.
- Source :
-
Journal of Neutron Research . 2024, Vol. 26 Issue 2/3, p59-67. 9p. - Publication Year :
- 2024
-
Abstract
- The linac and the 3 GeV rapid-cycling synchrotron (RCS) at the Japan Proton Accelerator Research Complex (J-PARC) were designed to provide 1-MW proton beams to the following facilities. Due to the improvement of the accelerator system, we accelerated a 1-MW beam with a small beam loss. The lack of anode current in the radiofrequency (RF) cavity, rather than beam loss, limits the RCS beam power. Recently, we developed a new acceleration cavity that can accelerate a beam with a low anode current. This new cavity enables us to reduce the requirement for the anode power supply and accelerate a beam of more than 1 MW. We considered how to achieve beam acceleration beyond 1 MW. So far, a beam of up to 1.5 MW is expected to be accelerated after replacing the RF cavity. We also studied to achieve an up to 2 MW beam in J-PARC RCS. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 10238166
- Volume :
- 26
- Issue :
- 2/3
- Database :
- Academic Search Index
- Journal :
- Journal of Neutron Research
- Publication Type :
- Academic Journal
- Accession number :
- 180007828
- Full Text :
- https://doi.org/10.3233/JNR-240003