Back to Search Start Over

Analyzing sedimentation patterns in the Naumure Multipurpose Project (NMP) reservoir using 1D HEC-RAS modeling.

Authors :
Dahal, Vishan
Kunwar, Subash
Bhandari, Shishir
Chaudhary, Subash
Gautam, Saurab
Bhatt, Nabin
Regmi, Ram Krishna
Source :
Scientific Reports. 9/27/2024, Vol. 14 Issue 1, p1-12. 12p.
Publication Year :
2024

Abstract

Naumure Multipurpose Project (NMP) featuring a 169 m high Concrete Face Rock Filled Dam (CFRD) is the proposed reservoir project in the West Rapti River with an installed capacity of 218.34 MW. Most of the rivers in Nepal carry significant sediment loads that will consequently catalyze reservoir sedimentation. This phenomenon prevails as the primary factor in reducing reservoirs useful life, making ineffective for both flood control and hydroelectricity generation. Ultimately, such process of sedimentation has adverse impacts on projects economic feasibility and long-term sustainability. Therefore, the objective of this research was to examine the expected sediment deposition pattern in the NMP reservoir throughout its operational period by employing 1D HEC-RAS model to simulate the sedimentation process. The model was simulated for 10, 20, 30, 40 and 50 years. Yang's equation as a sediment transport function, Active layer as a bed sorting method and Toffaleti as a fall velocity method were best suited for the river reach. The delta deposition was formed between 11 km and 22 km upstream of the dam region in the Jhimruk river, with the sediment deposition depth reaching peaks of about 23 m, 38 m, 39 m, 41 m and 49 m in 10, 20, 30, 40 and 50 years, respectively. Similarly, the delta deposition was formed between 13 km and 33 km upstream of dam region in the Madi river, with the sediment deposition depth reaching peaks of about 47 m, 62 m, 60 m, 68 m and 75 m in 10, 20, 30, 40 and 50 years respectively. Headcutting of delta deposition occurred between 20 and 30 year due to high flood during low stage of reservoir. Furthermore, the study revealed that about 6.22%, 11.61%, 15.94%, 22.96% and 25.65% of the storage capacity of NMP reservoir will be depleted in 10, 20, 30, 40 and 50 years respectively. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
20452322
Volume :
14
Issue :
1
Database :
Academic Search Index
Journal :
Scientific Reports
Publication Type :
Academic Journal
Accession number :
179968836
Full Text :
https://doi.org/10.1038/s41598-024-73883-x