注浆固结法在残矿回收中的应用.
- Source :
-
Gold (1001-1277) . Sep2024, Vol. 45 Issue 9, p27-32. 6p. - Publication Year :
- 2024
-
Abstract
- In response to the issue of resource depletion in an old gold mine, this study proposes 2 recovery schemes to effectively utilize shallow high-grade residual ore resources: one with reserved crown pillars and one without. The reserved crown pillar scheme includes options for 1 m and 0.5 m pillars, while the no reserved pillar scheme involves grouting consolidation with thicknesses of 5 m and 10 m. Based on the results of numerical simulations, the joint support method of partial crown pillar reservation and grouting consolidation of dry backfill materials was selected, with a reserved crown pillar thickness of 1 m and grouting consolidation thickness of 5 m. The process flow for residual ore recovery is detailed. By grouting and consolidating the existing loose backfill material in the upper voids of the trial stope, 4 500 1 ores containing 24 kg gold were successfully recovered, yielding an economic benefit of 6.619 8 million yuan. The success of this trial will continue to guide future residual ore recovery efforts in the enterprise. [ABSTRACT FROM AUTHOR]
- Subjects :
- *RESOURCE exploitation
*GROUTING
*ORES
*COMPUTER simulation
*GOLD
Subjects
Details
- Language :
- Chinese
- ISSN :
- 10011277
- Volume :
- 45
- Issue :
- 9
- Database :
- Academic Search Index
- Journal :
- Gold (1001-1277)
- Publication Type :
- Academic Journal
- Accession number :
- 179914907
- Full Text :
- https://doi.org/10.11792/hj20240906