Back to Search Start Over

Installation and construction technology of high-pier large-span hyperbolic steel girder in mountain area.

Authors :
Zhao, Long
Zheng, Yongfei
Ma, Ligang
Source :
AIP Conference Proceedings. 2024, Vol. 3203 Issue 1, p1-8. 8p.
Publication Year :
2024

Abstract

Taking the case of Yongji high-speed Zaoyuan Yellow River Bridge in Gansu Province, the installation method of high pier and long-span curved light steel girder is discussed in depth. According to the construction characteristics of the project, three construction schemes of overall pushing, cantilever assembly and cable hoisting are proposed, and finite element model calculation, analysis and verification of the same depth are carried out. Finally, the comprehensive comparison and selection of the cost, duration and quality of the three schemes are carried out to determine that the cable crane is the best construction technology, which provides the technical basis for the investment decision of the builder and provides a more comprehensive reference for the construction technology of the same type of bridge. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
0094243X
Volume :
3203
Issue :
1
Database :
Academic Search Index
Journal :
AIP Conference Proceedings
Publication Type :
Conference
Accession number :
179103988
Full Text :
https://doi.org/10.1063/5.0223356