A two-stage stochastic programming model for electric substation flood mitigation prior to an imminent hurricane.

Authors :
Austgen, Brent
Kutanoglu, Erhan
Hasenbein, John J.
Source :
IISE Transactions. Aug2024, p1-18. 18p. 13 Illustrations.
Publication Year :
2024

Abstract

AbstractWe present a stochastic programming model for informing the deployment of ad hoc flood mitigation measures to protect electric substations prior to an imminent and uncertain hurricane. The first stage captures the deployment of a fixed number of mitigation resources, and the second stage captures grid operation in response to a contingency. The primary objective is to minimize expected load shed. We develop methods for simulating flooding induced by extreme rainfall and construct two geographically realistic case studies, one based on Tropical Storm Imelda and the other on Hurricane Harvey. Applying our model to those case studies, we investigate the effect of the mitigation budget on the optimal objective value and solutions. Our results highlight the sensitivity of the optimal mitigation to the budget, a consequence of those decisions being discrete. We additionally assess the value of having better mitigation options and the spatial features of the optimal mitigation. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
24725854
Database :
Academic Search Index
Journal :
IISE Transactions
Publication Type :
Academic Journal
Accession number :
179100787
Full Text :
https://doi.org/10.1080/24725854.2024.2393654