Back to Search Start Over

Dynamic response of deep-buried circular loess tunnel under P-wave action.

Authors :
Cheng, Xuansheng
Sun, Haodong
Zhang, Shanglong
Ding, Kai
Xia, Peiyan
Source :
Applied Mathematical Modelling. Oct2024, Vol. 134, p556-569. 14p.
Publication Year :
2024

Abstract

• The internal force analytical solution of lining structure under P-ware action was obtained by using the analytical method. • The influence of the hardness of surrounding rock and peak acceleration on the analytical solution were analyzed. • Through the engineering, the reasons for the large error between numerical solution and analytical solution was analyzed. • The most unfavorable position of lining structure under P-wave seismic load was proposed. In an earthquake, the strong interaction between the surrounding rock and the lining structure causes the lining structure susceptible to extrusion or shear damage, and predicting the internal force distribution trend of the lining structure by the analytical method was advantageous for the preliminary design of the tunnel structure. In this work, the quasi-static method was used to approximate the displacement and deformation caused by the P-wave seismic load as far-field compressive stress. The analytical solution of the internal force for the lining structure was obtained by the analytical method, and the reliability of the analytical method was further verified. The dynamic response law of the lining structure was analyzed using numerical solutions in conjunction with engineering examples. The results show that the analytical method can be used to predict the trend of internal force distribution in the lining structure under seismic action, which has important theoretical guiding significance for the preliminary design of the tunnel structure. With the decrease in the hardness of the loess surrounding, the relative deviation of the theoretical, numerical, and literature results gradually decreases. With the increase of ground motion intensity, the interaction between the loess surrounding and the lining structure becomes more intense, and the internal force of the lining structure gradually increases. The numerical results were greater than the analytical results due to the consideration of the influence of initial stress. Under the action of the P-wave earthquake, the extreme values of the internal force with the lining structure mainly occurred at the location of the vault, arch waist, and inverted, and the most unfavorable positions of circular loess tunnel lining structures under P-wave seismic load was proposed. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
0307904X
Volume :
134
Database :
Academic Search Index
Journal :
Applied Mathematical Modelling
Publication Type :
Academic Journal
Accession number :
178682204
Full Text :
https://doi.org/10.1016/j.apm.2024.06.017