Back to Search Start Over

Engineering geological characteristics in planned tunnel B route of the Yogyakarta-Bawen toll road.

Authors :
Itsnaini, Nur
Putra, Doni Prakasa Eka
Indrawan, I. Gde Budi
Source :
AIP Conference Proceedings. 3/28/2024, Vol. 3110 Issue 1, p1-8. 8p.
Publication Year :
2024

Abstract

This paper presents a comprehensive engineering geological assessment of the planned Tunnel B route within the Yogyakarta-Bawen Toll Road project, a critical national infrastructure undertaking connecting Central Java and the Special Region of Yogyakarta. With Tunnel B spanning 510 meters, this study aimed to inform the project's planning and implementation processes. The research encompassed geological surveys, core drilling assessments, testing of rock and soil properties, and analysis of geoelectric survey data. The findings delineate two primary geological units: completely weathered andesite and completely weathered breccia tuff. Groundwater was detected at depths ranging from 13 to 40 meters above the tunnel's intended elevation. The resistivity of rocks and soils along the tunnel route ranged from 5 to 750 Ωm, leading to the identification of six zones (A, B, C1, C2, C3, D, E, and F) with distinct geological engineering characteristics. This research offers pivotal insights essential for the effective planning and execution of the Yogyakarta-Bawen Toll Road project. It provides crucial information regarding the geological attributes and expected tunnel behavior, ensuring the project's success and long-term sustainability. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
0094243X
Volume :
3110
Issue :
1
Database :
Academic Search Index
Journal :
AIP Conference Proceedings
Publication Type :
Conference
Accession number :
176251561
Full Text :
https://doi.org/10.1063/5.0205207