Cite
COLLABORATIVE PRODUCTION SCHEDULING WITH MULTI-ENTERPRISE IDLE CAPACITY SHARING.
MLA
Liao, Y. G., et al. “Collaborative Production Scheduling with Multi-Enterprise Idle Capacity Sharing.” International Journal of Simulation Modelling (IJSIMM), vol. 23, no. 1, Mar. 2024, pp. 137–48. EBSCOhost, https://doi.org/10.2507/IJSIMM23-1-CO1.
APA
Liao, Y. G., Zhang, H., Ren, N., & Wang, T. Y. (2024). Collaborative Production Scheduling with Multi-Enterprise Idle Capacity Sharing. International Journal of Simulation Modelling (IJSIMM), 23(1), 137–148. https://doi.org/10.2507/IJSIMM23-1-CO1
Chicago
Liao, Y. G., H. Zhang, N. Ren, and T. Y. Wang. 2024. “Collaborative Production Scheduling with Multi-Enterprise Idle Capacity Sharing.” International Journal of Simulation Modelling (IJSIMM) 23 (1): 137–48. doi:10.2507/IJSIMM23-1-CO1.